    PERMIT FEE SCHEDULE
    APRIL 21, 2006

    Plan submittal

    Commercial and Residential Development

    Site plan submittal fee: $50.00; revisions and resubmittals $50.00 each.

    Building plan submittal fee: $50.00; revisions and resubmittals $50.00 each.

    Sign plan submittal fee: $50.00; revisions and resubmittals $50.00 each.

    Building permits

    Residential and agricultural:

    The building permit fee for residential and agricultural structures shall be based on the value of the structure and according to the following schedule which is Schedule K of the standard building code. The value is calculated at $40.00 per square foot for heated area and $10.00 per square foot for unheated areas such as unfinished basements, porches, decks, patios, etc. Agricultural structures not intended for human occupancy are calculated at $3.00 per square foot.

    (Take the above totals and go to building valuation chart for fees.)

    Apartments, condominiums, townhouses:

    The building permit fee for all Apartments, Condominiums and Townhouses shall be $0.20 per square foot for all enclosed areas (heated or unheated) and $0.10 per square foot for loading docks, open storage buildings; (example: truck or equipment sheds), etc. Retaining wall: $0.06 per square foot.

    Permits for existing interior or exterior structural shall be $0.20 per square foot.

    Commercial:

    The building permit fee for all commercial buildings shall be $0.20 per square foot for all enclosed areas (heated or unheated) and $0.10 per square foot for loading docks, open storage buildings; (example: truck or equipment sheds), etc. Retaining wall: $0.06 per square foot.

    Permits for existing interior or exterior structural shall be $0.20 per square foot.

    Minimum building permit fee:

    Residential\$30.00

    Commercial\$40.00

    Building permit expires 18 months from date of issue.

    CITY OF CUMMING
    RESIDENTIAL BUILDING
    PERMIT FEE CHART
    Current from current SBCCI
    Building Valuation Fee
    0 — 3,000 $30.00
    3,001 — 4,000 30.00
    4,001 — 5,000 35.00
    5,001 — 6,000 40.00
    6,001 — 7,000 45.00
    7,001 — 8,000 50.00
    8,001 — 9,000 55.00
    9,001 — 10,000 60.00
    10,001 — 11,000 65.00
    11,001 — 12,000 70.00
    12,001 — 13,000 75.00
    13,001 — 14,000 80.00
    14,001 — 15,000 85.00
    15,001 — 16,000 90.00
    16,001 — 17,000 95.00
    17,001 — 18,000 100.00
    18,001 — 19,000 105.00
    19,001 — 20,000 110.00
    20,001 — 21,000 115.00
    21,001 — 22,000 120.00
    22,001 — 23,000 125.00
    23,001 — 24,000 130.00
    24,001 — 25,000 135.00
    25,001 — 26,000 140.00
    26,001 — 27,000 145.00
    27,001 — 28,000 150.00
    28,001 — 29,000 155.00
    29,001 — 30,000 160.00
    30,001 — 31,000 165.00
    31,001 — 32,000 170.00
    32,001 — 33,000 175.00
    33,001 — 34,000 180.00
    34,001 — 35,000 185.00
    35,001 — 36,000 190.00
    36,001 — 37,000 195.00
    37,001 — 38,000 200.00
    38,001 — 39,000 205.00
    39,001 — 40,000 210.00
    40,001 — 41,000 215.00
    41,001 — 42,000 220.00
    42,001 — 43,000 225.00
    43,001 — 44,000 230.00
    44,001 — 45,000 235.00
    45,001 — 46,000 240.00
    46,001 — 47,000 245.00
    47,001 — 48,000 250.00
    48,001 — 49,000 255.00
    49,001 — 50,000 260.00
    50,001 — 51,000 264.00
    51,001 — 52,000 268.00
    52,001 — 53,000 272.00
    53,001 — 54,000 276.00
    54,001 — 55,000 280.00
    55,001 — 56,000 284.00
    56,001 — 57,000 288.00
    57,001 — 58,000 292.00
    58,001 — 59,000 296.00
    59,001 — 60,000 300.00
    60,001 — 61,000 304.00
    61,001 — 62,000 308.00
    62,001 — 63,000 312.00
    63,001 — 64,000 316.00
    64,001 — 65,000 320.00
    65,001 — 66,000 324.00
    66,001 — 67,000 328.00
    67,001 — 68,000 332.00
    68,001 — 69,000 336.00
    69,001 — 70,000 340.00
    70,001 — 71,000 344.00
    71,001 — 72,000 348.00
    72,001 — 73,000 352.00
    73,001 — 74,000 356.00
    74,001 — 75,000 360.00
    75,001 — 76,000 364.00
    76,001 — 77,000 368.00
    77,001 — 78,000 372.00
    78,001 — 79,000 376.00
    79,001 — 80,000 380.00
    80,001 — 81,000 384.00
    81,001 — 82,000 388.00
    82,001 — 83,000 392.00
    83,001 — 84,000 396.00
    84,001 — 85,000 400.00
    85,001 — 86,000 404.00
    86,001 — 87,000 408.00
    87,001 — 88,000 412.00
    88,001 — 89,000 416.00
    89,001 — 90,000 420.00
    90,001 — 91,000 424.00
    91,001 — 92,000 428.00
    92,001 — 93,000 432.00
    93,001 — 94,000 436.00
    94,001 — 95,000 440.00
    95,001 — 96,000 444.00
    96,001 — 97,000 448.00
    97,001 — 98,000 452.00
    98,001 — 99,000 456.00
    99,001 — 100,000 460.00
    100,001 — 101,000 463.00
    101,001 — 102,000 466.00
    102,001 — 103,000 469.00
    103,001 — 104,000 472.00
    104,001 — 105,000 475.00
    105,001 — 106,000 478.00
    106,001 — 107,000 481.00
    107,001 — 108,000 484.00
    108,001 — 109,000 487.00
    109,001 — 110,000 490.00
    110,001 — 111,000 493.00
    111,001 — 112,000 496.00
    112,001 — 113,000 499.00
    113,001 — 114,000 502.00
    114,001 — 115,000 505.00
    115,001 — 116,000 508.00
    116,001 — 117,000 511.00
    117,001 — 118,000 514.00
    118,001 — 119,000 517.00
    119,001 — 120,000 520.00
    120,001 — 121,000 523.00
    121,001 — 122,000 526.00
    122,001 — 123,000 529.00
    123,001 — 124,000 532.00
    124,001 — 125,000 535.00
    125,001 — 126,000 538.00
    126,001 — 127,000 541.00
    127,001 — 128,000 544.00
    128,001 — 129,000 547.00
    129,001 — 130,000 550.00
    130,001 — 131,000 553.00
    131,001 — 132,000 556.00
    132,001 — 133,000 559.00
    133,001 — 134,000 562.00
    134,001 — 135,000 565.00
    135,001 — 136,000 568.00
    136,001 — 137,000 571.00
    137,001 — 138,000 574.00
    138,001 — 139,000 577.00
    139,001 — 140,000 580.00
    140,001 — 141,000 583.00
    141,001 — 142,000 586.00
    142,001 — 143,000 589.00
    143,001 — 144,000 592.00
    144,001 — 145,000 595.00
    145,001 — 146,000 598.00
    146,001 — 147,000 601.00
    147,001 — 148,000 604.00
    148,001 — 149,000 607.00
    149,001 — 150,000 610.00
    150,001 — 151,000 613.00
    151,001 — 152,000 616.00
    152,001 — 153,000 619.00
    153,001 — 154,000 622.00
    154,001 — 155,000 625.00
    155,001 — 156,000 628.00
    156,001 — 157,000 631.00
    157,001 — 158,000 634.00
    158,001 — 159,000 637.00
    159,001 — 160,000 640.00
    160,001 — 161,000 643.00
    161,001 — 162,000 646.00
    162,001 — 163,000 649.00
    163,001 — 164,000 652.00
    164,001 — 165,000 655.00
    165,001 — 166,000 658.00
    166,001 — 167,000 661.00
    167,001 — 168,000 664.00
    168,001 — 169,000 667.00
    169,001 — 170,000 670.00
    170,001 — 171,000 673.00
    171,001 — 172,000 676.00
    172,001 — 173,000 679.00
    173,001 — 174,000 682.00
    174,001 — 175,000 685.00
    175,001 — 176,000 688.00
    176,001 — 177,000 691.00
    177,001 — 178,000 694.00
    178,001 — 179,000 697.00
    179,001 — 180,000 700.00
    180,001 — 181,000 703.00
    181,001 — 182,000 706.00
    182,001 — 183,000 709.00
    183,001 — 184,000 712.00
    184,001 — 185,000 715.00
    185,001 — 186,000 718.00
    186,001 — 187,000 721.00
    187,001 — 188,000 724.00
    188,001 — 189,000 727.00
    189,001 — 190,000 730.00
    190,001 — 191,000 733.00
    191,001 — 192,000 736.00
    192,001 — 193,000 739.00
    193,001 — 194,000 742.00
    194,001 — 195,000 745.00
    195,001 — 196,000 748.00
    196,001 — 197,000 751.00
    197,001 — 198,000 754.00
    198,001 — 199,000 757.00
    199,001 — 200,000 760.00
    200,001 — 201,000 763.00
    201,001 — 202,000 766.00
    202,001 — 203,000 769.00
    203,001 — 204,000 772.00
    204,001 — 205,000 775.00
    205,001 — 206,000 778.00
    206,001 — 207,000 781.00
    207,001 — 208,000 784.00
    208,001 — 209,000 787.00
    209,001 — 210,000 790.00
    210,001 — 211,000 793.00
    211,001 — 212,000 796.00
    212,001 — 213,000 799.00
    213,001 — 214,000 802.00
    214,001 — 215,000 805.00
    215,001 — 216,000 808.00
    216,001 — 217,000 811.00
    217,001 — 218,000 814.00
    218,001 — 219,000 817.00
    219,001 — 220,000 820.00
    220,001 — 221,000 823.00
    221,001 — 222,000 826.00
    222,001 — 223,000 829.00
    223,001 — 224,000 832.00
    224,001 — 225,000 835.00
    225,001 — 226,000 838.00
    226,001 — 227,000 841.00
    227,001 — 228,000 844.00
    228,001 — 229,000 847.00
    229,001 — 230,000 850.00
    230,001 — 231,000 853.00
    231,001 — 232,000 856.00
    232,001 — 233,000 859.00
    233,001 — 234,000 862.00
    234,001 — 235,000 865.00
    235,001 — 236,000 868.00
    236,001 — 237,000 871.00
    237,001 — 238,000 874.00
    238,001 — 239,000 877.00
    239,001 — 240,000 880.00
    240,001 — 241,000 883.00
    241,001 — 242,000 886.00
    242,001 — 243,000 889.00
    243,001 — 244,000 892.00
    244,001 — 245,000 895.00
    245,001 — 246,000 898.00
    246,001 — 247,000 901.00
    247,001 — 248,000 904.00
    248,001 — 249,000 907.00
    249,001 — 250,000 910.00
    250,001 — 251,000 913.00
    251,001 — 252,000 916.00
    252,001 — 253,000 919.00
    253,001 — 254,000 922.00
    254,001 — 255,000 925.00
    255,001 — 256,000 928.00
    256,001 — 257,000 931.00
    257,001 — 258,000 934.00
    258,001 — 259,000 937.00
    259,001 — 260,000 940.00
    260,001 — 261,000 943.00
    261,001 — 262,000 946.00
    262,001 — 263,000 949.00
    263,001 — 264,000 952.00
    264,001 — 265,000 955.00
    265,001 — 266,000 958.00
    266,001 — 267,000 961.00
    267,001 — 268,000 964.00
    268,001 — 269,000 967.00
    269,001 — 270,000 970.00
    270,001 — 271,000 973.00
    271,001 — 272,000 976.00
    272,001 — 273,000 979.00
    273,001 — 274,000 982.00
    274,001 — 275,000 985.00
    275,001 — 276,000 988.00
    276,001 — 277,000 991.00
    277,001 — 278,000 994.00
    278,001 — 279,000 997.00
    279,001 — 280,000 1,000.00
    280,001 — 281,000 1,003.00
    281,001 — 282,000 1,006.00
    282,001 — 283,000 1,009.00
    283,001 — 284,000 1,012.00
    284,001 — 285,000 1,015.00
    285,001 — 286,000 1,018.00
    286,001 — 287,000 1,021.00
    287,001 — 288,000 1,024.00
    288,001 — 289,000 1,027.00
    289,001 — 290,000 1,030.00
    290,001 — 291,000 1,033.00
    291,001 — 292,000 1,036.00

     

    Penalties - When work is started prior to obtaining a valid permit for such work, the permit fee shall be doubled.

    Plumbing, electrical and mechanical residential only.

    For (one-step permitting) Residential - new construction only.

    The one-step permitting procedure allows the Building Contractor to purchase all the necessary permits. The sub-contractors must fill out an affidavit form stating that they are responsible for the particular job, prior to requesting an inspection. Must also provide valid Georgia State Certification card and current Georgia Business License.

    Heated Area
    (sq. ft.)
    Plumbing Electrical Mechanical
    0 — 1,000 $35.00 $35.00 $35.00
    1,001 — 2,000 45.00 45.00 45.00
    2001 — 3,000 55.00 55.00 55.00
    3001 — 4,000 65.00 65.00 65.00

     

    Plumbing, electrical and mechanical permits for commercial:

    Must be permitted individually by the licensed contractor prior to any installation. Fees are determined by items installed. Failure to permit will result in doubled fees.

    Reinspection Fee - $25.00 for each reinspection needed.

    Miscellaneous:

    Certificate of occupancy

    ($25.00 when building permit is a minimum fee)

    ($45.00 when no building permit is required)

    Communication towers/antennas $600.00; any additional accessory structures (co-locate), each\$600.00

    An electrical permit and building permit must also be purchased if applicable.

    Demolition fee:

    0 up to 100,000 cubic feet\$50.00

    100,000 cubic feet and over\$100.00

    Requires inspection prior to demolition to determine safety requirements.

    Fence, per 100 feet (minimum fee $30.00) inspection required\$7.00

    Moved structures\$200.00

    Signs, per $1,000.00 of the actual bid price of the job or fraction thereof\$40.00

    Minimum permit fee\$40.00

    Sign less than 15 square feet does not require a permit.

    Signs requiring electricity must also obtain an electrical permit.

    Swimming pools, per square foot\$0.20

    Pool decking, per square foot\$0.10

    Tents:

    Per square foot, commercial\$0.05

    Minimum permit fee\$40.00

    Tent less than 120 square feet does not require a permit.

    Mobile home or office permits:

    HUD certified mobile home or mobile office permits, temporary storage\$75.00

    Relocation of non-HUD certified mobile home or mobile office permits\$75.00

    These mobile home or office permit fees include the electrical permit fee.

    Application or Activity Fee
    Airports: Limited ..... $5,000.00
    General ..... 25,000.00
    Helicopter Landing Facility ..... 500.00
    Building Permit for Commercial Tower ..... 500.00
    Construction Landfill ..... 3,500.00
    Home Occupation Permit ..... 100.00
    Home Business Use Permit ..... 100.00
    Development fees:
    Land Disturbance Permits
    (Grading Permits)
    Residential, per lot ..... 15.00
    Minimum ..... 250.00
    Commercial, per acre ..... 40.00
    Minimum ..... 350.00
    Minor land disturbing ..... 75.00
    Preliminary plat review ..... 200.00
     Plus per additional lot ..... 10.00
    Revised plat submission ..... 150.00
    Street name signs per intersection ..... 120.00
    Traffic control signs, each ..... 75.00
    Applications for road name change involving:
     Replacement of one sign ..... 300.00
     Replacement of two or more signs ..... 300.00
      Plus per additional sign ..... 30.00
    Rezoning fees:
    Application seeking:
    R1, R2
     Per acre ..... 30.00
     Minimum ..... 400.00
    R3
     Per unit ..... 30.00
     Minimum ..... 750.00
    NS, HB, CBD, INST, OCMS, PSC, MU
     Per acre .....  50.00
     Minimum ..... 750.00
    M1
     Per acre ..... 50.00
     Minimum ..... 750.00
    MU residential services fee, per month per residence ..... 0.00
    Existing Zoning Condition Amendment ..... 500.00

     

    VARIANCE FEES/CONDITIONAL USE

    Residential\$400.00

    Commercial\$750.00

    Appeal to City Council:

    Residential\$400.00

    Commercial (including, multifamily)\$500.00

    Plumbing permits:

    Commercial, residential (additions and remodeling), and others

    Fixture Fee Per
    Fixture
    Water closet ..... $4.00
    Lavatories ..... 4.00
    Sinks ..... 4.00
    Bathtubs ..... 4.00
    Showers ..... 4.00
    Water heater ..... 4.00
    Dishwasher ..... 4.00
    Garbage disposal ..... 4.00
    Ice machine ..... 4.00
    Drinking fountain ..... 4.00
    Floor drains ..... 4.00
    Roof drains/downspouts ..... 4.00
    Items not listed will be charged at the rate of $4.00 each
     Minimum permit fee ..... 40.00
    Washing machine ..... 4.00
    Laundry tubs ..... 4.00
    Pressure reducing valve ..... 4.00
    Backflow preventor ..... 4.00
    Gas piping (per appliance) ..... 4.00
    Sump pump ..... 15.00
    Thermal expansion valve ..... 4.00
    Grease trap (500 gal. and up) ..... 35.00
    Septic tank ..... 15.00
    Sewer inspection ..... 15.00
    Sewer ejector pump ..... 20.00
    Sprinkler system building, per head ..... 0.50
     (or minimum fee) ..... 40.00
    Trap primer ..... 4.00
    Irrigation lawn, per head ..... 0.50
     (or minimum fee) ..... 40.00

     

    Electrical permit:

    Commercial, residential (additions and remodeling) and others

    Service amperage, subpanels figured same as service panel

    0 — 99\$5.00

    100 — 199\$7.00

    200 — 299\$10.00

    300 — 399\$12.00

    400 — 499\$14.00

    500 and up, plus $0.05 per amp above 500\$15.00

    Motors less than 1 HP\$3.00

    1 — 5 HP\$5.00

    5.5 — 10 HP\$7.00

    10.5 — 20 HP\$12.00

    20.5 — 50 HP\$16.00

    50.5 and up, plus $0.05 per HP above 50.5\$18.00

    Transformers, heaters, furnaces and appliances

    Less than 1 KW\$3.00

    1 — 3.5 KW\$5.00

    4 — 9.5 KW\$7.00

    10 — 24.5 KW\$12.00

    25 KW and up, plus $0.15 KW above 25\$12.00

    Electrical miscellaneous (temporary electric service is included with building permit)

    Swimming pools\$40.00

    Receptacle/switches, each\$0.50

    Fluorescent commercial fixtures, each\$0.50

    Showcase/meat case fixtures, each\$5.00

    Walk-in cooler, each\$10.00

    Floodlights (below 300 W), each\$0.50

    Floodlights (above 300 W), each\$2.00

    Gasoline pumps, each\$10.00

    Air conditioning/heat pump/furnace, each\$5.00

    Water heater, each\$4.00

    Clothes dryer, each\$4.00

    Dishwasher, each\$3.00

    Disposal, each\$3.00

    Exhaust fans/attic fans, each\$3.00

    Electric range, each\$4.00

    Oven, each\$4.00

    Vent hood (residential), each\$3.00

    Vent hood (commercial), each\$15.00

    Low voltage permits (based on cost of job),

    0 up to $5,000.00 minimum fee\$40.00

    $5,000.00 and over min. fee plus $5.00 per\$1,000.00

    Sign lighting:

    Building, each sign\$10.00

    Freestanding, each sign\$25.00

    Parking lot lights, per pole\$5.00

    Items not listed will be charged at KW or HP rate.

    Minimum permit fee\$40.00

    Mechanical permit fee:

    Commercial, residential (additions and remodeling) and others

    Furnace

    0 — 150,000 BTU\$20.00

    151,000 — 300,000 BTU\$30.00

    301,000 — 1,000,000 BTU\$45.00

    1,001,000 and up\$70.00

    Air conditioning (compressor HP or tons)

    1 — 10 HP\$20.00

    11 — 30 HP\$25.00

    31 — 100 HP\$30.00

    101 HP and up\$35.00

    Heat pump (HP or tons)

    1 — 10 HP\$35.00

    11 — 30 HP\$50.00

    31 HP and up\$70.00

    Refrigeration

    1 — 10 HP\$20.00

    11 — 30 HP\$25.00

    31 — 100 HP\$30.00

    101 HP and up\$40.00

    Ventilating system (motor HP)

    0 — 10 HP\$25.00

    10.5 — HP and up\$35.00

    Other:

    Air handling unit\$20.00

    Gas piping (per appliance)\$4.00

    Exhaust fans\$3.00

    Hood (residential)\$3.00

    Hood (commercial)\$35.00

    Gas tank (commercial), per tank\$20.00

    Gas pump (commercial), per tank\$10.00

    Duct work/preexisting air conditioning and heating unit\$20.00

    Minimum permit fee\$40.00